

First Home Foundations
Architex Online, have created a brand new and exciting planning package designed for first-time clients looking to apply for planning permission in Ireland. It is the combination of a guaranteed fixed price (eliminating billable hours fear) and the convenience of a fully online, streamlined process.
Here is an introduction to our First Home Foundations package for a first-time domestic planning clients, focusing on clarity, fixed costs, and a stress free process.
🏡 The Architex Online "First Home Foundations" Package
Pricing & Scope
This is a fixed-fee package specifically designed for new-build, one-off residential dwellings up to 220 sq. meters (approx. 2,370 sq. ft.) of gross floor area

The "Stress-Free Submission" Guarantee
We guarantee the planning documents will meet all local authority submission requirements. We handle all planning-related revisions until submission is accepted as valid.
What's Included in the €4,950 Fixed Fee?
The goal is to provide everything a customer needs to submit a valid Full Planning Application to their local County Council (exclusive of third-party reports and council fees).
1. 📐 Design & Drawing (The Core Plans)
-
Initial Design Consultation: Up to three virtual meetings to develop a functional and beautiful design brief based on your lifestyle and site constraints.
-
Comprehensive Drawing Set: All essential plans required by the local authority, including:
-
Site Location Map (1:1000 or 1:2500 Scale).
-
Site Layout Plan (1:500 Scale) showing boundaries, access, and wastewater proposals.
-
Detailed Floor Plans, Elevations, and Sections (1:100 or 1:200 Scale) of the proposed dwelling.
-
Contiguous Elevation Drawings (where required) showing neighbouring properties.
-
2. 📝 Planning Documentation (The Paperwork)
-
Full Planning Application Form: Preparation and completion of the statutory application form.
-
Newspaper & Site Notice Preparation: Drafting the required legal notices for publication and display.
-
Design & Planning Report: A professional statement detailing the design rationale, compliance with the relevant County Development Plan, and materials proposal.
-
3. 💻 Submission & Monitoring (The Process)
-
Digital Submission: Lodgement of the full, validated application to the relevant local authority.
-
Liaison: Direct correspondence with the planning authority on your behalf until the application is fully lodged and valid
What's NOT Included (Required 3rd Party Costs)
Were upfront! This section is vital for managing clients expectations and ensuring they know the full build budget.
⚠️ Next Step Clarity:
This package gets you Planning Permission. It does not include the detailed Construction Drawings or site inspections required for the actual build (Commencement Notice/Assigned Certifier). We offer a separate, affordable "Build-Ready" Package for that stage.
✅Contact Us to Book Your Free 15-Minute Planning Feasibility Check Today!✅

